PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Cutting beam pockets at Stair -4 3rd floor Facing South-East (800x600).jpg Installing conduit for temporary power Facing South (800x600).jpg Installing Derrick -3 Facing West (800x600).jpg Installing layout for the wall forms at column line 6.5 (G-C.7) Facing South-East (800x600).jpg Under Derrick -3 Facing North (800x600).jpg
Previous page Under Derrick -3 Facing North (800x600)
Under Derrick -3 Facing North (800x600)